OPTI-EX photo

OPTI-EX™

Sold to LLOG Exploration - Deployed in U.S. GOM Mississippi Canyon for the "Who Dat" Development.

CONSTRUCTION

HULL: Samsung Heavy Industries, Geoje Island, Korea
TOPSIDES: Kiewit Offshore Services, Ingleside, Texas USA

HULL

PAYLOAD (tonne)

Topsides (dry)5,000
Riser and Mooring
(up to)
5,000
Variables Loads900

 

HULL WEIGHT (tonne)

Hull Steel Weight6,100
Hull Outfitting Weight1,200
Ballast Capacity15,000
Displacement25,000

 

HULL CONFIGURATION (m)

Deck Size60.0 x 60.0
Pontoon Length76.8
Top of Column ABL42.0
Column Width12.0
Span Between Columns43.2
Draft26.0 to 30.0
 

TOPSIDES

PRODUCTION CAPACITIES (as equipped)

Design Flow Rates
Oil Production60,000 bopd @ 24°~ 35° API Gravity
Produced Water40,000 bwpd (Discharged @ ≤ 30 ppm)
Total Fluids75,000 bfpd
Gas Production150 MMscfd (SG 0.65 ~ 0.80)
Gas Compression2 x 25 MMscfd Reciprocating Compressors
3,500 hp Each – Discharging @ 3,400 psi
Pipeline Pumps3 x 20,000 bopd Quintuplex Pumps
1,500 hp Each – Discharging @ 3,400 psig

 

GENERAL

Water Depth Independent
Suitable for SCR / Flexible / Hybrid Risers

 

EXPANDABLE CAPACITY

Up to 20 Slots Available For Production / Import / Export Risers
1,000 ston Future Loads
3,500 Square Feet Additional Space